Back to projects
Marine & Topside Works • Current

Design and Build of Marine & Topside Works for Jebel Dhanna Terminal

A large-scale infrastructure project involving the design and construction of marine and topside works at Jebel Dhanna Terminal, including buildings, infrastructure, roads, and pavement works.

Location: Jebel Al Dhanna, Abu DhabiClient: AD PortsYear: 2025MarineInfrastructureLogistics
Design and Build of Marine & Topside Works for Jebel Dhanna Terminal

Project Overview

The Design and Build of Marine & Topside Works for Jebel Dhanna Terminal is a significant infrastructure project commissioned by AD Ports to enhance the Jebel Dhanna Terminal’s capabilities. This project includes the design and construction of marine facilities and topside works, which are critical to the expansion of the terminal’s operational capacity. The scope of work involves constructing buildings, upgrading infrastructure, and laying down roads and pavement works within the terminal. The development also focuses on improving the operational efficiency of the terminal by ensuring state-of-the-art facilities are built for marine access, cargo handling, and logistics support. The project is progressing steadily, with 55% completion reached so far. The work is expected to be completed within 360 days, with a planned focus on sustainable and efficient construction practices.

Scope of Work

  • Design and construction of marine and topside works
  • Infrastructure works including buildings, roads, and pavement
  • Enhancing the operational capacity of Jebel Dhanna Terminal
Project Completion Time
360 Days
Budget Adherence
100%

Related Projects

View all
Design and build of 60 Villas and Related Infrastructure Works Bidaa Al Mutawwa - (Western Region)
Residential Construction
Completed

Design and build of 60 Villas and Related Infrastructure Works Bidaa Al Mutawwa - (Western Region)

Bidaa Al Mutawwa, Western Region, Abu Dhabi

This project involves the design and construction of 60 villas, along with the required infrastructure works, located in the Western Region of Abu Dhabi.

Duration
24 Months
20 Villas Design & Build - Yabana, Western Region
Residential Construction
Completed

20 Villas Design & Build - Yabana, Western Region

Yabana, Jarrah, Western Region, Abu Dhabi

This project involves the design and construction of 20 villas, along with related infrastructure works, located in Yabana - Jarrah, in the Western Region of Abu Dhabi.

Duration
16 Months
Residential Tower (B + G + M + P + 30 Typ.)
Residential Construction
Completed

Residential Tower (B + G + M + P + 30 Typ.)

-

This project involves the construction of a residential tower with a basement, ground floor, mezzanine, parking levels, and 30 additional floors. It was developed by Blue Lake Properties in collaboration with Mazaya Engineering Consultant.

Duration
30 Months
Orient House for Development & Constructions

Let’s build

Have a similar brief?

We can replicate this delivery model with the right governance, safety and schedule certainty.